Nos process, solutions d'ingenierie reseau et systemes
Sites survey
We begin everything with a site survey; this is a crucial step in various fields such as construction, real estate, and urban planning. This comprehensive assessment involves collecting and analyzing data about a specific location to inform decision-making and project planning.
Implementation
Notre cycle de vie de projet se compose de sept phases : réception, lancement, planification, sélection des produits, exécution, suivi et contrôle, et clôture. Ces phases constituent le parcours de votre projet, du début à la fin. Dans certains cas, nous assurons le transfert de compétences à l'administrateur client.
Technical support
We help customers install and configure software. We diagnose and resolve network connectivity issues. We provide guidance on using new product features. We update company websites with technical documentation and tips. We perform regular system maintenance and updates.
Cabling & Structures
Network cabling is the physical infrastructure that connects computers and other devices to a network. It can be installed by your IT department or by an external contractor, but regardless of the contractor, it's essential to ensure that the network cabling is installed correctly.
Cloud
The cloud allows users to access the same files and applications from almost any device because computing processes and storage take place on servers in a data center, not locally on the user's device.
Firewall
A firewall is a computer security system that restricts internet traffic entering, leaving, or traveling within a private network. This software, or dedicated hardware-software unit, works by selectively blocking or allowing data packets.
Virtualization
Virtualization is a technology you can use to create virtual representations of servers, storage, networks, and other physical machines.
Telecommunications
Telecommunications is defined as the transmission of information over a distance using electronic, computer, wired, optical or electromagnetic transmission technologies.
Relays radio - Talky walky
La radiocommunication est un moyen de transmission d'informations d'un point à un autre. Grâce aux antennes radiocommunication, les ondes radio sont regroupées autour d'une fréquence porteuse et transmises au récepteur dans la gamme des micro-ondes.
Pabx
A PABX or PBX (Private Branch Exchange) is the Anglicism for a private telephone exchange. Since the French term is rarely used in the market, we use the terminology PABX and PBX or IP PBX, IPBX or IP PBX for versions using IP standards.
ROUTING/SWITCHING
Routing and switching are the basic functions of computer networks. Routing involves finding a path between two or more networks, while switching involves transferring data from one device to another within a network.
Low current
Les plages de tension sont définies en fonction du type de courant (alternatif ou continu) et du type de tension (basse ou haute tension). En mode alternatif, la basse tension couvre une plage comprise entre 50 et 1 000 volts. En fonctionnement continu, elle couvre une plage comprise entre 120 et 1 500 volts.
Accumulator
Accumulators and batteries are electrochemical systems used to store energy. They release the chemical energy generated by electrochemical reactions in the form of electrical energy, expressed in watt-hours (Wh).
Lightning arrestor and lightning rod
Lightning protection systems are used to prevent or mitigate damage to buildings caused by lightning. They protect a building's internal electrical components, helping to prevent fires or electrocutions. Lightning protection comes in the form of a lightning rod, usually a metal rod, attached to the building to protect it from lightning.
Earthing
The soles of our feet are covered with more than 200 nerve endings, and the contact of our skin with the ground generates electron transfers (or energy transfers) between the Earth and our body, which can repair imbalances in the body.
CCTV system
Il s'agit d'une technologie permettant de visionner des images filmées via une simple connexion internet. Son fonctionnement est simple : les caméras sont installées dans la zone à surveiller et connectées à un ordinateur. Les appareils filment et transmettent les images via le réseau.
Access control system
An access control system determines who is allowed to enter or exit, where, and when. Historically, this control was partly achieved through keys and locks.
Intrusion system
An intrusion detection system (IDS) is responsible for identifying attacks and techniques and is often deployed out-of-band in listen-only mode so that it can analyze all traffic and generate intrusion events from suspicious or malicious traffic.
Fire detection
A fire detection system aims to detect and report the start of a fire as early as possible, in order to reduce the time needed to implement fire-fighting measures and limit its impact.
Fire extinguishing
Un système d'extinction d'incendie fait partie intégrante de toute infrastructure de protection incendie. La «suppression d'incendie» est un terme générique désignant tout ensemble d'équipements techniques conçus pour éteindre un incendie. Cette opération peut être réalisée par l'application d'une substance extinctrice telle que l'eau, la mousse ou des composés chimiques.
Data Center Support
Ensure availability by creating redundancies? Maintain a stable indoor climate? Create more rigorous testing protocols? Implement at least one type of data center maintenance? Hire adequate staff for data center operations and maintenance? Maintain a clean environment? Adopt good data hygiene? Maintain emergency preparedness.